An exterior view of a Bengaluru Metro train operating on an elevated track during daytime.
Technology

Bengaluru Metro Pink Line: Elevated section to open

Representative photo ยท Photo: StoriesofKabeera / Wikimedia Commons, CC BY-SA 4.0

By: NexVani DeskDate: 12 November 2026Views: 0

Prime Minister Narendra Modi is set to inaugurate the 7.5-km elevated section of Bengaluru Metro's Pink Line, boosting the city's transit network.

Prime Minister Narendra Modi is scheduled to inaugurate a 7.5-kilometre elevated section of Bengaluru's Pink Line on Friday, following previous delays. This launch pushes the city's operational rapid transit system beyond the 100-kilometre mark to reach a total of 103.6 kilometres. With this expansion, Bengaluru solidifies its position as the home of India's second-largest Metro network, trailing only Delhi. The newly completed segment within bengaluru metro will officially welcome members of the public starting at six in the morning on November 14.

The newly opened elevated stretch runs between Kalena Agrahara and Tavarekere, passing through Suddaguntepalya. Commuters traveling from Bannerghatta Road will gain improved access toward the Electronic City corridor and other parts of the wider rapid transit system. A crucial feature of this new route is the interchange at Jayadeva station, which connects passengers directly to the Electronic City line and facilitates travel toward key areas such as HSR Layout, Jayanagar, and Whitefield.

The new 7.5-km elevated Pink Line section will take Bengaluru's operational Metro network to 103.6 km.

State Bengaluru Development Minister Krishna Byre Gowda noted that the Jayadeva interchange makes the short line significantly more effective than it would be as a standalone route. Initially, trains on this newly inaugurated segment will run at eight-minute intervals. Five total trains have been allocated to the line, with four operating regularly and one kept on standby. Gowda explained that the frequency could be adjusted once signalling systems stabilize and authorities evaluate actual passenger demand. Fares for the route have not yet been discussed by officials.

The opening of this elevated stretch marks only the initial phase of the larger Pink Line initiative. The complete corridor is designed to feature both the 7.5-kilometre elevated segment and a 13.7-kilometre underground section stretching toward Nagawara. Meanwhile, the state government has outlined a near-term goal to expand the local transit infrastructure past 170 kilometres over the next 18 months, with a long-term vision to eventually build a network spanning 400 to 500 kilometres.

Why it matters

This launch significantly improves urban transit and connectivity for commuters moving between Bannerghatta Road and the Electronic City corridor. By pushing the city's operational network to 103.6 kilometres, the partial opening of the Pink Line serves as a vital step toward a much larger regional transit expansion.

Add NexVani Media as a preferred source on Google

Sources

ND

NexVani Desk

NexVani Media brings you the most important world news as it happens, with every story linked to its sources.