
Mumbai-Pune Greenfield Expressway Tender Date Extended to November 27
Representative photo ยท Photo: Kaushal Karkhanis from Mumbai + Bangalor / Wikimedia Commons, CC BY-SA 2.0
The NHAI has extended the tender deadline for the โน15,000 crore Mumbai-Pune Greenfield Expressway, an eight-lane project designed to cut travel time to 90 minutes.
Plans are currently underway to enhance road infrastructure between two of Maharashtra's major economic hubs through the development of a new Mumbai-Pune Greenfield Expressway. This ambitious project, estimated at a cost of โน15,000 crore, aims to provide a high-speed alternative to the existing route, significantly reducing travel time and alleviating the heavy traffic congestion currently observed on the corridor. Once completed, the new eight-lane highway is expected to facilitate a journey time of just 90 minutes between the two cities.
Understanding the Mumbai-Pune Greenfield Expressway
The proposed highway will stretch approximately 130 kilometres and run parallel to the current Mumbai-Pune Expressway. Designed to handle a daily volume of nearly three lakh vehicles, the road is expected to be a critical addition to the regional transport network. The National Highways Authority of India (NHAI) is overseeing the project and has recently sought a detailed report to assess various technical and operational requirements. To ensure a comprehensive evaluation, the deadline for submitting project tenders has been officially extended until November 27, 2026.
Construction is planned to occur in two distinct phases. The initial phase will focus on a 30-kilometre stretch between Pagote and Chowk, requiring an investment of โน4,500 crore and the excavation of two tunnels through the Sahyadri mountain ranges. The second phase will involve the development of the remaining 100 kilometres, with preparatory work and the drafting of a Detailed Project Report (DPR) currently in progress.
Beyond serving local commuters, the expressway is intended to bolster connectivity for motorists travelling toward Bengaluru. By allowing vehicles to bypass the congested city roads of Pune, the project aims to eliminate delays caused by traffic signals and crowded urban stretches. This infrastructure development is expected to strengthen the transit corridor between Maharashtra and Karnataka, providing a more efficient route for intercity travel.
The new 130-kilometre expressway aims to reduce travel time between Mumbai and Pune to 90 minutes.
Why it matters
The extension of the tender deadline signals a critical phase in the project's development as the NHAI finalizes the necessary assessments. This expressway is significant for the region as it addresses the growing traffic volume between Mumbai and Pune, which currently places immense pressure on existing road networks.
For commuters and long-distance travellers heading toward Bengaluru, the project offers a strategic advantage by bypassing urban congestion. By streamlining the journey between these major cities, the initiative is set to improve logistics and personal travel efficiency across the Maharashtra-Karnataka corridor.
Sources
More like this

Italian Paolo Bulgari Passes Away at 89

Ahmedabad Techies Shift to Small Businesses Amid AI Concerns

Riyadh Air resumes Dubai and Manila flights and launches Jakarta route

